May 2005 Open House Display Boards
Project Background
36.
Ex-TVR-3
1.
Project Needs
37.
Ex-TVR-4
2.
Project Location
3.
NEPA Process
Route 29 Interchange Design Options
4.
Project Development Schedule
38.
NJ-29 Screening Process
5.
Daily Traffic Numbers
39.
NJ-29 Existing
6.
No Build Volumes AM Peak
40.
Ex-29 1a
7.
No Build Volumes PM Peak
41.
Ex-29 1b
8.
LOS
42.
Ex-29 1c
9.
PM LOS
43.
Ex-29 2
10.
AM LOS
11.
Crash Data
I-95 Widening Options
44.
PA Inside Widening B&A
Bridge Alternatives
45.
PA Outside Widening B&A
12.
Assumptions for Design Options
46.
Ex-PA Outside 1
13.
Bridge Screening Process
47.
Ex PA Outside 2
14.
Double Decker Bridge
48.
PA Outside Widening Truck
15.
Contraflow Lanes
49.
NJ Outside Widening Truck
16.
Collector / Distributor
17.
CD Alt1 A 1
Project Cost Estimates
18.
CD Alt1 A 2
49.
Estimated Costs
19.
CD Alt A 3
20.
Dimissed Matrix
Noise Analyses
21.
Bridge Option Advanced
50.
Chart Noise Analysis Process
22.
EX-US-SS-3.25.05
51.
Chart Noise Levels
23.
Upstream
52.
Chart Noise Measurement
24.
Ex-DS-SS-3.25.05
53.
Aerial Noise Measurement Site
25.
Downstream
54.
State Noise Criteria Comparison
26.
New Wider Bridge
55.
Noise Level Predictions A
27.
Centerline 1
56.
Noise Level Predictions B
28.
Centerline 2
57.
Noise Level Predictions C
29.
Centerline 3
30.
Centerline 4
Next Steps
31.
Bicycle Feasibilty
58.
Air Quality
59.
What Happens Next
Taylorsville Road Interchange Design Options
32.
TVR Screening Process
33.
TVR Interchange Existing
34.
Ex-TVR 1
35.
Ex-TVR 2
Please click to open
.
PDF files
If you have questions about this info, call hotline: (800) 879-0849