May 2005 Open House Display Boards
Project Background 36. Ex-TVR-3
1. Project Needs 37. Ex-TVR-4
2. Project Location  
3. NEPA Process Route 29 Interchange Design Options
4. Project Development Schedule 38. NJ-29 Screening Process
5. Daily Traffic Numbers 39. NJ-29 Existing
6. No Build Volumes AM Peak 40. Ex-29 1a
7. No Build Volumes PM Peak    41. Ex-29 1b
8. LOS 42. Ex-29 1c
9. PM LOS 43. Ex-29 2
10. AM LOS  
11. Crash Data I-95 Widening Options
  44. PA Inside Widening B&A
Bridge Alternatives 45. PA Outside Widening B&A
12. Assumptions for Design Options 46. Ex-PA Outside 1
13. Bridge Screening Process    47. Ex PA Outside 2
14. Double Decker Bridge 48. PA Outside Widening Truck
15. Contraflow Lanes 49. NJ Outside Widening Truck
16. Collector / Distributor  
17. CD Alt1 A 1 Project Cost Estimates
18. CD Alt1 A 2 49. Estimated Costs 
19. CD Alt A 3  
20. Dimissed Matrix Noise Analyses
21. Bridge Option Advanced 50. Chart Noise Analysis Process
22. EX-US-SS-3.25.05 51. Chart Noise Levels
23. Upstream 52. Chart Noise Measurement
24. Ex-DS-SS-3.25.05 53. Aerial Noise Measurement Site
25. Downstream 54. State Noise Criteria Comparison
26. New Wider Bridge 55. Noise Level Predictions A
27. Centerline 1 56. Noise Level Predictions B
28. Centerline 2 57. Noise Level Predictions C
29. Centerline 3  
30. Centerline 4 Next Steps
31. Bicycle Feasibilty 58. Air Quality
  59. What Happens Next
Taylorsville Road Interchange Design Options  
32. TVR Screening Process  
33. TVR Interchange Existing  
34. Ex-TVR 1  
35. Ex-TVR 2  

Please click to open. PDF files
If you have questions about this info, call hotline: (800) 879-0849